Eritrea 2000 t/d gold plant

This project is located in Eritrea, processing capacity is 2000 t/d. It use cyanidation, CIL process. Jinpeng supplied belt conveyors, feeders, agitation tanks, etc.

Capacity:2000t/d

Finished time:2014

Location:Eritrea

Mine Design Institute
Project :
Hundreds mining projects in more than 30 countries
Majors :
Geology,Shaft building,mining, Mining machine, Mineral processing, Smelting, Civil engineering, Electricity, General drawing, Water supply and drainage ,Tailing treatment, Heating and Ventilation,ect
LEAVE A MESSAGE
CHAT NOW
Product introduction

This project is located in Eritrea, processing capacity is 2000 t/d. It use cyanidation, CIL process. Jinpeng supplied belt conveyors, feeders, agitation tanks, etc.

Manufacturing

We have a very strict management for each project, and one people will be responsible for each project from the beginning to the end,which can make sure the whole process smoothly.
Design institute will start from engineering design, precise positioning technology and its products, not only guarantee the technology, but also reduce customer cost and choose the best process.
At the same time, we have a very strict quality management for equipment production,and have passed the ISO 9001:2008 international quality certification. Several large automatic CNC cutting machine, CNC automatic welding machine, 5 meters CNC vertical lathe, CNC lathe, CNC boring machine, and has the longest 15 meters large lathe in Shandong, all of this can guarantee the accuracy of the equipment and the appearance of fine quality.

Browse other product

You can share this to your friends

Contact Us

Please leave a message and we'll get back to you.

Send