Jiangxi 1000t/d fluorite ores processing project

JINPENG contracts EPC turnkey service of this project, including metallurgical experimental study,engineering design,equipment manufacture and installation&commissioning etc.

Project site:Jiangxi province

Production capacity:1000t/d

Mine Design Institute
Project :
Hundreds mining projects in more than 30 countries
Majors :
Geology,Shaft building,mining, Mining machine, Mineral processing, Smelting, Civil engineering, Electricity, General drawing, Water supply and drainage ,Tailing treatment, Heating and Ventilation,ect
LEAVE A MESSAGE
CHAT NOW
Introduction

Project introduction:JINPENG contracts EPC turnkey service of this project, including metallurgical experimental study,engineering design,equipment manufacture and installation&commissioning etc.

Project process:Based on metallurgical test report, flotation separation process is adopted, which is one time rougher,two times scavengers,seven times cleaners and the concentrate from the forth time cleaner being reground.

Final concentrate grade:97.50%

Recovery rate of concentrate:92.00%