Cambodia 100 t/d gold mine tailings dry drainage project

Customer has flotation system, and we provide flotation tailings dewatering system, also guide the installation and debugging.Tailings dry drainage is a new technology for tailings disposal in domestic, using a lot of thickeners for concentration, then through efficient dewatering equipment such as vibrating sieve dehydration processing, to get the slag at last.

Capacity:100t/d

Finished Time:2016.8

Location:Phnom Penh

Mine Design Institute
Project :
Hundreds mining projects in more than 30 countries
Majors :
Geology,Shaft building,mining, Mining machine, Mineral processing, Smelting, Civil engineering, Electricity, General drawing, Water supply and drainage ,Tailing treatment, Heating and Ventilation,ect
LEAVE A MESSAGE
CHAT NOW
Project Process

The project process:flotation tailing with filter press for dehydration.

Process introduction

Tailings dry drainage is a new technology for tailings disposal in domestic, using a lot of thickeners for concentration, then through efficient dewatering equipment such as vibrating sieve dehydration processing, to get the slag,The slag can transport to the fixed place for storage.

Application field

It’s mainly used for the concentration of tailing, dehydration process, to achieve the dry tailings pile, so as to avoid pollution of the environment, which is the first choice for the implementation of green mining technology.

Flowchart

1 The combination of hydro cyclone and the vibration sieve: the tailing will go through hydro cyclone first,and then the under flow will go to high frequency vibration sieve for dehydration, which can make the tailing water content within 16%, the over flow of the hydro clone usually by thickener machine and filter press for dehydration.

2 Directly use of thickener, filter filter: the front investment is larger for this method, and applicable scope is smaller, sometimes can't satisfy the production efficiency and dehydration.

Manufacturing

We have a very strict management for each project, and one people will be responsible for each project from the beginning to the end,which can make sure the whole process smoothly.
Design institute will start from engineering design, precise positioning technology and its products, not only guarantee the technology, but also reduce customer cost and choose the best process.
At the same time, we have a very strict quality management for equipment production,and have passed the ISO 9001:2008 international quality certification. Several large automatic CNC cutting machine, CNC automatic welding machine, 5 meters CNC vertical lathe, CNC lathe, CNC boring machine, and has the longest 15 meters large lathe in Shandong, all of this can guarantee the accuracy of the equipment and the appearance of fine quality.